Ir al contenido principal

Entradas

Mostrando las entradas etiquetadas como benefits

THE CURVE SHOWING THE BENEFITS OF USING CONSTRUCTABILITY IN PROJECTS, COST REDUCTION AND SHORTENING OF SCHEDULE

The following graphic showing the typical Cumulative Cost vs Time, express the benefits that are searched with the use of CONSTRUCTABILITY, both Cost Reduction and Schedule shortening. There is an increase in the cost of the project in the phases of engineering and the beginning of the detailed engineering due to the inclusion of the construction team, but, at the beginning of the construction phase the benefits are obtained due to the reduction of cost and schedule.