THE CURVE SHOWING THE BENEFITS OF USING CONSTRUCTABILITY IN PROJECTS, COST REDUCTION AND SHORTENING OF SCHEDULE
The
following graphic showing the typical Cumulative Cost vs Time, express the
benefits that are searched with the use of CONSTRUCTABILITY, both Cost
Reduction and Schedule shortening.
There is an
increase in the cost of the project in the phases of engineering and
the beginning of the detailed engineering due to the inclusion of the
construction team, but, at the beginning of the construction phase the
benefits are obtained due to the reduction of cost and schedule.